True/False

A civil engineer is calculating the total settlement of a bridge pier after two recorded shifts in the soil, measured as -5.123 cm and -18.47 cm. True or False: To evaluate the total settlement using the expression −5.123−18.47-5.123 - 18.47, the engineer should align the decimal points and add 5.123 to 18.470, then apply a negative sign to the resulting sum.

0

1

Updated 2026-09-19

Contributors are:

Who are from:

Tags

OpenStax

Intermediate Algebra @ OpenStax

Ch.1 Foundations - Intermediate Algebra @ OpenStax

Algebra

Recall in Bloom's Taxonomy

Related