Multiple Choice

A problem-solving system is tasked with calculating the total cost of a project. It is provided with the original problem and the following intermediate answers it has already found: 'Number of developers: 3', 'Project duration: 2 months', and 'Cost per developer per month: $5,000'. The system then produces the final answer: 'The total cost is $10,000.' Which statement best analyzes the failure in the final step of this process?