Fill in the Blank

A project manager uses the function h(x)=2x+1h(x) = 2x + 1 to calculate the estimated cost of raw materials for xx production cycles. To find the cost for a modified schedule represented by x+1x + 1 cycles, the manager must evaluate h(x+1)h(x + 1). According to the rules of function evaluation, the manager should replace the variable xx in the original function with the expression ____.