True/False

A project scheduler is verifying a resource depletion graph that has a y-intercept of 2 and a slope of -2/3. True or False: To locate a third point for verification, the scheduler can apply the slope as 2/(-3), which involves moving 2 units up and 3 units to the left from the starting y-intercept.