An electrical contractor is reviewing a foreman's proposed toolbox talk schedule for a three-day residential project.

Proposed Schedule:

  • Day 1: Task: Digging a 24-inch trench for outdoor conduit. (Topic: Ladder Safety)
  • Day 2: Task: Running wire through a narrow, unventilated crawlspace. (Topic: Confined-Space Awareness)
  • Day 3: Task: Installing a new sub-panel in a garage. (Topic: Electrical Shock)

Analyzing the relationship between the scheduled tasks and the training topics, which day demonstrates a failure to correctly select a topic based on the hazards actually present?