An electrical contractor realizes that despite having accurate initial estimates, actual costs for commercial retrofits consistently exceed projections by the end of the project, leading to poor gross margins. Simultaneously, the utilization rate is low due to crews frequently waiting for specialized lifts that were not scheduled in advance. The owner needs to design a new operational feedback loop to prevent these specific issues. Which of the following proposed workflows best synthesizes estimating, scheduling, and job-cost reporting into a new standard operating procedure to correct this problem?