Fill in the Blank

An operations manager is evaluating why a technically flawless electrical project resulted in a lost customer. After reviewing the interaction logs, the manager notes that the initial lead intake, the estimate, the scheduling process, and the final follow-up were all executed perfectly. However, the electricians discovered a hidden code violation but fixed it without discussing the extra $400 cost with the homeowner until the final invoice was presented. The manager determines that this single failure in problem and ____ communication was the fatal error that undid all earlier goodwill.