Analyze the following scenario: An electrical contractor is sued for $20,000 by a homeowner who claims a recent wiring job caused a power surge. After a thorough investigation, the court proves the surge was actually caused by the utility company and dismisses the case. However, the contractor is still required to pay $7,500 in legal fees to their attorney for the six-month defense.

Based on the definition of Contractor Liability Risk, which statement best explains why this $7,500 loss is considered a liability risk for the business?