Fill in the Blank

As an electrical contractor evaluating a drafted bid, you notice the estimator applied standard labor units to non-standard tasks like excavation, hoisting, and owner-supplied fixture assembly. You determine this pricing strategy is invalid because failing to perform a separate estimate review allows ____ labor to be absorbed into the base estimate, which will ultimately erode your actual profit margin.