Sequence Ordering

As an electrical contractor, you plan to install a specialized, unlisted control panel. The local inspector (AHJ) has evaluated it and deemed it 'identified' for this specific use. Analyze the compliance process and arrange the following workflow steps in the correct sequence to ensure the installation meets code requirements.