Sequence Ordering

You are an electrical contractor preparing for a rewiring project in a residential home built before 1978. To comply with federal Lead-Safe Renovation, Repair, and Painting (RRP) Rule documentation requirements, arrange these administrative and field steps in the correct order from the start of the project to the end of the compliance period.