Sequence Ordering

You are building an inspection correction recordkeeping system from the ground up for your electrical contracting business. No system currently exists — crews are relying on memory and informal notes after failed inspections. Arrange the following design steps in the most logical order to produce a complete, functional log that converts every rejection into a tracked, disputable, and closeable task.