Learn Before
Multiple Choice

You are drafting the scope document for a 200-amp panel upgrade at a single-family home built in 1972. The job requires the utility company to temporarily disconnect power, the new panel will be installed in a finished basement wall, and the existing overhead service line runs near a large oak tree. To protect your business from post-job disputes, you need to write the exclusions section of your proposal. Which of the following drafted exclusions sections would you include in your proposal?

0

1

Updated 2026-05-07

Contributors are:

Who are from:

Tags

Electrician Business Operations

Running an Electrical Contracting Business Course

Related