Multiple Choice

You are preparing a written scope of work and price proposal for a customer who has requested a 200-amp panel upgrade. During your diagnostic site visit, you discovered that the home has no grounding electrode conductor connected to the water pipe, the panel's neutral bar is unbonded, and the grounding wires on several circuits are floating. You must now draft a proposal that will hold up to permit inspection and accurately represent the full required scope of work. Which of the following proposals would you produce?

0

1

Updated 2026-05-07

Contributors are:

Who are from:

Tags

Electrician Business Operations

Running an Electrical Contracting Business Course

Related