Multiple Choice

Your electrical crew has just passed a rough-in inspection for a residential renovation. While reviewing the work before the drywallers arrive, you notice that a specific circuit was wired with a 20-amp breaker on 14-gauge wire, which is a code violation that the inspector missed. Based on the principle that inspection approval does not cure noncompliant work, how should you proceed?

0

1

Updated 2026-05-07

Contributors are:

Who are from:

Tags

Electrician Business Operations

Running an Electrical Contracting Business Course

Related