A customer disputes an invoice for a Level 2 EV charger installation, arguing that the cost of the electrical permit should have been covered by the base price. The contractor’s standardized offering clearly lists 'dedicated 50A circuit, conduit routing, and charger mounting' in the scope of work, but completely omits any mention of permits or panel capacity verification in both the included and excluded sections. True or False: Because the offering precisely defined the physical installation tasks, the contractor is protected from this dispute, as administrative requirements are inherently assumed to be outside a standard installation scope.