Multiple Choice

An electrical contracting business owner is comparing two different standard operating procedures (SOPs) for their field technicians.

SOP A: Technicians are instructed to always quote a full $5,000 service upgrade for any home with a 'full' breaker panel, regardless of the current amperage, to ensure the customer has maximum capacity. SOP B: Technicians must perform a load calculation and physical inspection to determine if a sub-panel, a panel swap, or a full upgrade is the most appropriate technical fit for the customer's specific needs.

Which of the following is the most accurate evaluation of these SOPs in the context of protecting the contractor's reputation and the customer's budget?