Multiple Choice

An electrical contractor is evaluating two different internal formulas for bidding on a residential sub-panel installation.

Formula 1: (Materials + Labor + Permits + Overhead) × 1.15 Formula 2: [(Materials + Labor + Permits) × 1.15] + Overhead

Analyze the relationship between these two formulas. Which of the following describes the impact of using Formula 2 instead of Formula 1?

0

1

Updated 2026-05-09

Contributors are:

Who are from:

Tags

Electrician Business Operations

Running an Electrical Contracting Business Course

Related