Sequence Ordering

An electrical contractor needs to present four different draft line-item formats for the same job — installing a new 20-amp kitchen circuit — to a residential customer. The contractor wants to rank these formats from LEAST effective to MOST effective at reducing sticker shock and building customer confidence, based on how well each format applies the principle of a transparent estimate breakdown.

Arrange the four formats below in order from least effective (1) to most effective (4):

Format A: 'KIT-CIRC-20A install pkg: $485'

Format B: 'Kitchen electrical work (all labor and materials combined): $485'

Format C: 'Labor (elec. hrs.): $275 / Matls. (20A Romex, brkr., J-box): $180 / Tax: $30'

Format D: 'Labor to run wiring and connect a new 20-amp kitchen circuit breaker: $275 / New 20-amp circuit breaker, wire, and junction box: $180 / Sales tax: $30'