Multiple Choice

A city government is evaluating two options for a large wetland area:

  • Option 1 (Factory): This project is projected to add $50 million to the nation's annual measured economic output, but would require draining the wetland.
  • Option 2 (Nature Park): This project is projected to add $2 million to the nation's annual measured economic output through tourism, while preserving the wetland.

The wetland in its natural state provides flood control and water purification services which, though not sold in any market, are estimated to be worth $10 million annually to the community.

If the decision is based solely on maximizing the immediate, measured contribution to national economic output, which choice will be made, and what is the primary flaw in using this single metric to assess the change in the community's overall well-being?

0

1

Updated 2025-08-13

Contributors are:

Who are from:

Tags

Social Science

Empirical Science

Science

Economy

Economics

CORE Econ

Introduction to Microeconomics Course

The Economy 2.0 Microeconomics @ CORE Econ

Ch.1 Prosperity, inequality, and planetary limits - The Economy 2.0 Microeconomics @ CORE Econ

Analysis in Bloom's Taxonomy

Cognitive Psychology

Psychology

Related