Multiple Choice

A contractor is reviewing a proposed contract for a partial-home standby generator. The proposal states: 'Install 14kW generator and transfer switch. Contractor will provide backup power to the refrigerator, well pump, and two 3-ton HVAC units. Both HVAC units will share a single 40-amp branch circuit on the generator panel. The generator's dedicated feed will be protected by a standard 60-amp breaker based on the wire gauge.' As the lead contractor, how should you evaluate the technical and business viability of this proposal?