Fill in the Blank

An electrical contractor is evaluating why a recent residential panel upgrade failed inspection in a jurisdiction enforcing the 2020 NEC. The contractor discovers that the customer declined the whole-home surge protector because it was presented on the estimate as an optional add-on. To rectify this flawed estimating strategy and prevent future unbillable return trips, the contractor must overhaul their proposal structure to include the surge-protective device as a __________ line item.