Multiple Choice

An electrical contractor is reviewing two different types of callback requests to determine the correct billing path:

  1. A customer reports a 'dead outlet' in the bathroom; the contractor finds the GFCI reset button just needed to be pushed after the customer used a high-powered hair dryer.
  2. A customer reports a 'dead outlet' in the bedroom; the contractor finds a loose wire because the technician did not properly tighten the terminal screw during the original install.

Which analysis correctly distinguishes how these two situations should be handled during the triage process?