Code Every Material Cost to the Correct Job Right Away

Each purchase should be tied to the correct project code so the job-costing system records the expense in the right place. When materials are ordered or received, the project code should be entered immediately rather than saved for later reconciliation. If an urgent supply run is paid with a company card, the receipt should be captured and assigned to the project at once so the cost report stays up to date.