Panel Upgrade Scope Specification Items

The scope document for a panel upgrade must specify the panel manufacturer, series, amperage rating, number of spaces, and NEMA rating (indoor or outdoor). It must also describe the service entrance — amperage, overhead or underground routing, and whether the meter base is replaced. Grounding details include ground rod(s), Ufer ground, water-pipe bond, and intersystem bonding termination. Finally, the scope should list which breakers require AFCI or GFCI protection per the locally adopted NEC edition.