Sub-Panel Installation When Panel Is Full but Service Is Adequate

When an existing panel has no open breaker slots but the service amperage is already adequate (typically 200 A), installing a sub-panel is the correct intervention. A sub-panel is fed from a breaker in the main panel and provides additional circuit slots without replacing the service entrance or meter base. This avoids the higher cost and utility coordination of a full service upgrade while solving the capacity problem at the branch-circuit level.