An electrical contractor is evaluating four different operational methods for handling surplus materials left over from a completed job. To maintain the financial health of the business and the reliability of future bidding estimates, the contractor must rank these methods by their ability to preserve job-cost report accuracy and protect profits.

Arrange the material-handling methods from the most financially sound and accurate (Order 1) to the most financially distortive and risky (Order 4).