An electrical contractor is reviewing two project reports: Job A (a commercial shop) shows a 10% material cost overrun, while Job B (a residential remodel) finished significantly under its material budget. Investigation reveals that leftover wire and conduit from Job A were taken directly to Job B without being processed back through the shop or returned to inventory. What is the most significant danger in using these distorted reports to make future business decisions?