An electrical contractor is reviewing a project's 'Actual vs. Estimate' report (as shown in the image) and notices that the cost for copper wire was significantly higher than what was bid, even though the quantities used were correct. Match the following business operational challenges with the specific way that 'attaching a supplier's quote reference to the estimate line item' addresses them.