Multiple Choice

An electrical contractor is using a Work Breakdown Structure (WBS) with four categories: Distribution Equipment, Fixtures & Devices, Containment & Cabling, and Permits & Inspections. Despite winning several jobs, the contractor is losing profit because they are not charging for the time spent daily on setting up tools and cleaning the workspace, nor the hours spent each week coordinating with other trades and updating the project schedule. Analyze the current structure; which two missing cost buckets are required to capture these specific 'hidden' costs?