Multiple Choice

You are creating a takeoff spreadsheet from scratch for a small retail renovation. The blueprints show the following items:

• 20 standard duplex wall outlets on the sales floor (mounted in drywall) • 8 standard duplex wall outlets in the warehouse (same specification, but installed through concrete block walls) • 12 Type-A track light fixtures on the sales floor ceiling • 6 Type-B recessed can lights in the fitting rooms

Which set of line items should you design for your takeoff to ensure quantities are properly matched to costs?

0

1

Updated 2026-05-04

Contributors are:

Who are from:

Tags

Electrician Business Operations

Running an Electrical Contracting Business Course

Related