Multiple Choice

While conducting a scope clarification for a new warehouse project, you analyze the following three document sections:

  1. Mechanical Schedule: Lists two large industrial dock heaters requiring 460V, 3-phase power.
  2. Electrical Power Plan: Shows two 208V, 3-phase circuits at the loading dock labeled 'Dock Heaters.'
  3. General Conditions: States 'The Electrical Contractor is responsible for coordinating with all other trades to ensure all equipment is provided with the correct power