Multiple Choice

While preparing a bid for a school renovation, you analyze three different document sections regarding the Fire Alarm system:

  1. Fire Alarm Specifications: 'The specialty system supplier shall provide and install all fire alarm devices, all system-specific cabling, and perform final terminations.'
  2. Electrical General Notes: 'The Electrical Contractor (EC) shall provide a dedicated 120V circuit to the main Fire Alarm Control Panel (FACP) and install all conduit, raceways, and back-boxes required for the fire alarm system.'
  3. Floor Plans: Show 60 fire alarm devices distributed across 15,000 square feet of a multi-story building.

Based on the concept of scope clarification and the interface risks described in the video, which conclusion correctly identifies the most significant cost risk that must be addressed in your estimate?