An electrical contractor is managing the direct material costs for a commercial lighting project. To mitigate operational risks, the contractor must carefully manage the physical lifecycle of $25,000 worth of light fixtures before they are consumed. Arrange the contractor's actions in the correct chronological order to safely navigate the multi-step material lifecycle.