Common Results of Weak Material Control in Electrical Contracting

Poor planning for purchasing and inventory creates several recurring problems on electrical jobs. Work can be delayed when needed items are not delivered in time for installation. Cash flow can tighten when materials are bought too early and too much money is tied up on the shelf or in the field. Profit can shrink when price increases happen after the estimate is built but before the materials are purchased. Losses from waste or theft can grow when leftover stock is not tracked, returned, or secured properly.