Leftover Material Returns for Electrical Contractors

Electrical projects often end with unused stock such as spare breakers, conduit, fittings, or material ordered for a design change that never happened. A good return process helps recover some cash and prevents the warehouse from filling up with unneeded inventory. Suppliers typically keep a restocking fee of about 15–25% on items they accept back, so contractors need both disciplined ordering and a clear method for recording the true cost of surplus in their books.